
Total-Automated Squander Tyre Recycling Line to Rubber Powder
hydraulic system comma simple procedure and safe period of time
Mechanical description colon the tires far more than 800 require to reduce comma and lower into four pieces in EPT periodthe dimensions of piece is 200-500mm interval
Notes for using tire cutter colon
a interval Inspect the knives regularly comma if seem clear blunt comma it ought to be keep timely comma and the service is two-three a long time period
b time period the oil in hydraulic station ought to be filtered and modified often interval EPTly filter once each one particular and 50 % yr interval
c period of time Sporting elements colon rubber seals comma shipped with one more established when ship the EPT to the buyer interval
three amp4 period of time EPT tire shredEPTZPS-900
Use colon
This EPT can immediately crush tires more compact than 800mm tires period of time At the EPT temperature comma can be place right crushed into fifty ast fifty mm block comma so the subsequent rotating can grind into ten-thirty meshes or wire and fiber separation gear interval
Characteristic colon
This EPT is a compact construction comma innovative engineering comma reduced energy usage comma large efficiency comma smashing off the test space for the structure comma upkeep is especially practical semi resources with carbide surfacing technological innovation comma large hardness comma large use resistance comma and repeated restore employing comma so has a EPTer services lifestyle semi rotary display for the lattice composition of steel mesh comma blanking big location comma enabling the screening of certified rubber time period After the partition of huge tires can obtain the influence of the identical excl
Mechanical description colon the tires of 800mm diameter and rubber ring can directly be broken into fifty ast50 mm of rubber block interval
Notes for employing EPT tire shredder colon
a interval Inject gear oil into EPT oil lparhypoid gear oil rpar comma major bearings use calcium-based grease lubrication comma a few months after the operation of the EPT comma the oil should be replaced and cleanse the gasoline tank interval Given that then adjust the oil once time every calendar year period of time
b Soon after offer with three comma000 tons of waste rubber lparin standard situation rpar commathe buyer should grind the blade cutting edge once time period The blades is the wear parts comma the EPT support lifestyle is 5-six a long time comma when providing the EPT to the consumer comma the shredEPTwill be geared up with edge hardness layer patching substance lparelectrodes rpar time period
five time period Double Rolls Rubber Crusher XKP-560
Use colon
Mostly utilized for crack massive rubber blocks into forty-50mm little rubber blocks period of time
Complex parameters colon
Structure colon The rollers undertake alloy cold difficult cast irons with put on-resisting comma durable characters interval The mill flour is with enamel comma substantial groove period
In orEPTto prolong the services life of the cracker comma we advise create foundations for rubber cracker period of time
The configurations of our XKP-560 rubber cracker are nylon bush grease lubrication and hard gear surface EPT with reduced noise and EPTer provider lifestyle period of time
5Our crackers are created XiHu (West Lake) Dis.Hu (West Lake) Dis.nized with good running platforms comma all the wires will be related nicely from managing program to motor interval When utilizing the EPT comma the clients just require to link immediately to the EPT period
Full-Computerized Waste Tyre Recycling Line to Rubber Powder
| No period of time | Title | Design | Qty time period lparQty rpar |
Motor EPT lparKW rpar | ||
| one | Single hook debeader | LSJ-1200 | one | 11 | ||
| 2 | EPT tyre cutter | QDJ-1200 | 1 | 5 period5 | ||
| 3 amp4 | EPT tyre shredder lparwith conveyor rpar |
ZPS-900 | one | 61 period5 | ||
| 5 | Double Rolls Rubber Crusher | XKP560 | one | 90 | ||
| 6 | Large conveyor equipment | BCL-eight | one | two | ||
| seven | Tiny conveyor equipment | BCL-3 | one | one period1 | ||
| 8 | Big Magnet separator | BMS22 | one | 2 period2 | ||
| 9 | Modest Magnet separator | SMS-1 | 1 | one period1 | ||
| 10 | Big Shaking screen | BSS-eight | 1 | seven period5 | ||
| eleven | Little Shaking screen | SSS-three | one | 3 | ||
| twelve | Fiber separator | FS110 | 1 | five period5 | ||
| 13 | Good Rubber Powder Pulverizing EPT | XJFS-420 | 4 | 123 | ||
| Sq. vibrating sieve | 600 | one | ||||
| Rubber powder collector | JFS500 | one | 7 period5 plus0 period75 equals8 period25 | |||
| Screw conveyer | Phi200mm | 1 | period75 | |||
| Screw conveyer | Phi132mm | one | period75 | |||
| Storage pin | 1 period5cbm | one | ||||
| Hopper | one | |||||
| Belt conveyer | 1 | period75 | ||||
| 14 | Steel Baller EPT | 30T | 1 | seven period5 | ||
| 15 | Rubber powder EPT EPT | one | three | |||
| 24 | 334 period4KW | |||||
| No | Title | model | amount | EPT | ||
| EPT tire pre-processing comma you will get lt 50 ast50MM rubber crumb | ||||||
| one | Ring cutter | QQJ-1200 | 1 | 5 period5KW | ||
| two | Loop EPT | YQJ-295 | one | 15KW | ||
| 3 | Strip cutter | QTJ-370 | 1 | five period5 KW | ||
| four | Block cutter | QKJ-200 | 1 | 11 KW | ||
| Rubber powder processing colon you will get 20-30 mesh rubber powder commaat the same time comma separate the fiber and steel wire | ||||||
| 5 | Tyre crusher | XKP400 | one | forty five KW | ||
| XKP450 | fifty five KW | |||||
| XKP560 | 75 KW | |||||
| six | Huge conveyor products | BCL-eight | one | 2 KW | interval | |
| seven | Small conveyor tools | BCL-3 | 1 | 1 period1 KW | ||
| 8 | Big Magnet separator | BMS22 | 1 | two period2 KW | ||
| 9 | Modest Magnet separator | SMS-1 | 1 | one period1 KW | ||
| ten | Massive Shaking screen | BSS-8 | 1 | 7 period5 KW | ||
| 11 | Modest Shaking monitor | SSS-3 | time period | one | 3 KW | |
| 12 | Fiber Separator | FS110 | one | eleven KW | ||

