
Semi-computerized Tyre Recycling Plant for Sale comma Tyre Recycle EPT
hydraulic method comma effortless procedure and secure time period
Mechanical description colon the tires a lot more than 800 need to reduce comma and reduce into 4 pieces in EPT periodthe dimensions of piece is 200-500mm period
Notes for making use of tire cutter colon
a period Examine the knives frequently comma if show up clear blunt comma it need to be sustain timely comma and the provider is two-3 several years interval
b interval the oil in hydraulic station must be filtered and altered regularly period of time EPTly filter after every single one particular and half year time period
c time period Wearing components colon rubber seals comma delivered with one more established when ship the EPT to the purchaser time period
three amp4 period of time EPT tire shredEPTZPS-900
Use colon
This EPT can straight crush tires smaller sized than 800mm tires period of time At the EPT temperature comma can be put straight crushed into fifty ast 50 mm block comma so the up coming rotating can grind into ten-30 meshes or wire and fiber separation equipment time period
Attribute colon
This EPT is a compact structure comma superior technological innovation comma minimal vitality consumption comma higher efficiency comma smashing off the check place for the structure comma routine maintenance is especially practical semi tools with carbide surfacing technologies comma substantial hardness comma higher dress in resistance comma and repeated restore employing comma so has a EPTer support life semi rotary display for the lattice construction of steel mesh comma blanking large spot comma enabling the screening of certified rubber period After the partition of massive tires can achieve the result of the very same excl
Mechanical description colon the tires of 800mm diameter and rubber ring can right be damaged into 50 ast50 mm of rubber block period of time
Notes for using EPT tire shredder colon
a period of time Inject equipment oil into EPT oil lparhypoid gear oil rpar comma primary bearings use calcium-based grease lubrication comma three months after the operation of the EPT comma the oil must be replaced and thoroughly clean the gasoline tank period of time Because then change the oil once time every yr period of time
b After offer with three comma000 tons of waste rubber lparin normal circumstances rpar commathe customer should grind the blade reducing edge when time interval The blades is the use components comma the EPT support existence is 5-6 a long time comma when offering the EPT to the customer comma the shredEPTwill be outfitted with edge hardness layer patching content lparelectrodes rpar period of time
5 time period Double Rolls Rubber Crusher XKP-560
Use colon
Primarily used for crack large rubber blocks into 40-50mm modest rubber blocks interval
Specialized parameters colon
Composition colon The rollers undertake alloy cold challenging forged irons with use-resisting comma sturdy characters period of time The mill flour is with teeth comma substantial groove period of time
In orEPTto lengthen the provider existence of the cracker comma we propose construct foundations for rubber cracker time period
The configurations of our XKP-560 rubber cracker are nylon bush grease lubrication and tough gear surface area EPT with lower sound and EPTer support existence period of time
5Our crackers are created XiHu (West Lake) Dis.Hu (West Lake) Dis.nized with good running platforms comma all the wires will be connected nicely from managing system to motor time period When using the EPT comma the consumers just require to link right to the EPT period
squander tyre recycling gear comma Waste tire recycling EPT
| No period of time | Name | Design | Qty interval lparQty rpar |
Motor EPT lparKW rpar | ||
| 1 | Single hook debeader | LSJ-1200 | one | eleven | ||
| 2 | EPT tyre cutter | QDJ-1200 | 1 | 5 period5 | ||
| three amp4 | EPT tyre shredder lparwith conveyor rpar |
ZPS-900 | 1 | 61 period5 | ||
| five | Double Rolls Rubber Crusher | XKP560 | one | 90 | ||
| 6 | Massive conveyor tools | BCL-8 | one | two | ||
| seven | Modest conveyor tools | BCL-3 | 1 | one period1 | ||
| 8 | Huge Magnet separator | BMS22 | one | two period2 | ||
| nine | Small Magnet separator | SMS-1 | 1 | 1 period1 | ||
| ten | Big Shaking display screen | BSS-8 | one | 7 period5 | ||
| 11 | Little Shaking display | SSS-three | 1 | 3 | ||
| 12 | Fiber separator | FS110 | one | five period5 | ||
| thirteen | Fantastic Rubber Powder Pulverizing EPT | XJFS-420 | 4 | 123 | ||
| Sq. vibrating sieve | 600 | one | ||||
| Rubber powder collector | JFS500 | one | 7 period5 plus0 period75 equals8 period25 | |||
| Screw conveyer | Phi200mm | 1 | period75 | |||
| Screw conveyer | Phi132mm | 1 | period75 | |||
| Storage pin | one period5cbm | 1 | ||||
| Hopper | 1 | |||||
| Belt conveyer | 1 | period75 | ||||
| fourteen | Steel Baller EPT | 30T | one | 7 period5 | ||
| 15 | Rubber powder EPT EPT | one | three | |||
| 24 | 334 period4KW | |||||
| No | Title | product | quantity | EPT | ||
| EPT tire pre-processing comma you will get lt fifty ast50MM rubber crumb | ||||||
| 1 | Ring cutter | QQJ-1200 | 1 | five period5KW | ||
| two | Loop EPT | YQJ-295 | one | 15KW | ||
| 3 | Strip cutter | QTJ-370 | one | five period5 KW | ||
| 4 | Block cutter | QKJ-200 | 1 | eleven KW | ||
| Rubber powder processing colon you will get twenty-30 mesh rubber powder commaat the same time comma separate the fiber and metal wire | ||||||
| 5 | Tyre crusher | XKP400 | 1 | forty five KW | ||
| XKP450 | 55 KW | |||||
| XKP560 | seventy five KW | |||||
| six | Big conveyor gear | BCL-eight | one | 2 KW | interval | |
| 7 | Tiny conveyor equipment | BCL-three | 1 | 1 period1 KW | ||
| eight | Large Magnet separator | BMS22 | 1 | two period2 KW | ||
| 9 | Small Magnet separator | SMS-1 | one | 1 period1 KW | ||
| 10 | Massive Shaking monitor | BSS-8 | one | 7 period5 KW | ||
| eleven | Modest Shaking screen | SSS-three | period of time | one | 3 KW | |
| 12 | Fiber Separator | FS110 | one | 11 KW | ||

